Senior Electrical Commissioning Project Engineer-Data Center Construction
FST Technical Services
Job Description
Lead the Systems That Power Critical Infrastructure
At FST Technical Services, we ensure the most complex facilities in the world perform exactly as designed. From data centers to advanced manufacturing environments, our work sits at the intersection of engineering precision and real-world execution.
We are looking for a Senior Electrical Commissioning Project Engineer who can lead from the front, solve complex technical challenges, and drive commissioning outcomes in high-stakes environments.
Why This Role Stands Out
This is not a checklist-driven commissioning role.
This is a position for someone who:
• Owns outcomes, not just tasks
• Understands systems holistically, not in silos
• Can operate independently while leading others
You will play a direct role in ensuring critical systems are designed correctly, installed properly, and perform under real-world conditions.
What You’ll Do
Project Lead...
At FST Technical Services, we ensure the most complex facilities in the world perform exactly as designed. From data centers to advanced manufacturing environments, our work sits at the intersection of engineering precision and real-world execution.
We are looking for a Senior Electrical Commissioning Project Engineer who can lead from the front, solve complex technical challenges, and drive commissioning outcomes in high-stakes environments.
Why This Role Stands Out
This is not a checklist-driven commissioning role.
This is a position for someone who:
• Owns outcomes, not just tasks
• Understands systems holistically, not in silos
• Can operate independently while leading others
You will play a direct role in ensuring critical systems are designed correctly, installed properly, and perform under real-world conditions.
What You’ll Do
Project Lead...
Ready to Apply?
Submit your application today and join our talented team at FST Technical Services.
Submit ApplicationJob Details
- Location Atlanta, GA
- Job Type Full-time
- Category other-general
- Posted Date June 24, 2026
- Application Deadline June 28, 2026