Section Engineer - Telecom

Hill International
📍 Mumbai, Maharashtra, India 💼 Full-time 🕒 Posted June 06, 2026

Job Description

Mumbai Metro Line 4 and 4A are part of the city’s expanding rapid transit network being developed by the Mumbai Metropolitan Region Development Authority (MMRDA). Line 4 is a major 32.3 km elevated metro corridor running from Wadala to Kasarvadavali in Thane, with around 30 stations and extensive connectivity across the eastern suburbs. This role focuses on ensuring effective interface management between civil, track, E&M, and system contractors to achieve a safe, reliable, and fully integrated transport system.

  • Supervise and monitor execution of telecom system works for the assigned metro corridor/section.
  • Ensure implementation of telecom systems in compliance with project specifications, applicable standards, contract requirements, and approved designs.
  • Coordinate with multidisciplinary teams including E&M, signaling, PSD, AFC, SCADA, civil, viaduct, architectural, and track teams for interface management.
  • Verify contractor measurements, work progres...
  • Ready to Apply?

    Submit your application today and join our talented team at Hill International.

    Submit Application

    Job Details

    • Location Mumbai, Maharashtra
    • Job Type Full-time
    • Category Engineers
    • Posted Date June 06, 2026
    • Application Deadline July 16, 2026