Job Description
Job Description
During the ATLAS Phase-II upgrade in Long Shutdown 3, an all-silicon Inner Tracker (ITk) will be installed, consisting of four silicon strip layers and five hybrid pixel layers. The detector will provide exceptional radiation hardness and fast charged-particle reconstruction. The CERN ATL-TRK team contributes to the ITk pixel detector construction through the assembly, testing, and integration of hybrid pixel detector modules and their further integration into the detector.
Your responsibilities
- Assemble and test silicon pixel detector modules used in particle physics experiments.
- Support and improve production processes to achieve and maintain high throughput levels.
- Contribute to increasing the parallelisation of testing procedures in laboratory environments.
- Develop and maintain in-house software tools to optimise workflows and analyse test data.
- Work with databases to record, track,...
Ready to Apply?
Submit your application today and join our talented team at CERN.
Submit ApplicationJob Details
- Location geneva, geneva
- Job Type Full-time
- Category ATS
- Posted Date June 28, 2026
- Application Deadline August 07, 2026